Go live Tranche 3: systems remain available thanks to toggles

After the summer, we will work towards the transition of Tranche 3. In this tranche, we will make the changed functionalities available via so-called toggles. As a result, no deployment takes place. You can already read details in the Fallback plan.

 

The Fallback Plan of Tranche 3 describes the process in case something goes wrong at or in the run-up to going live at the end of 2024 (an unhappy flow). In the Fallback Plan you can read how we are going to work with toggles. To go live, only toggles need to be automatically converted. This prevents a deployment where systems are temporarily unavailable. Around the time Tranche 3 goes live, you can continue to use the systems for market processes.

For the Fallback plan, go to MFFBAS: ‘Release’, ‘Tranche 3 A2.0’, folder ‘6. Transitie’.

Transition products

After the summer recess, the other transition products will follow, such as the implementation scenarios, the PCE document (on process agreements, communication structure and entry and exit criteria), the Aftercare Plan and the Integral Go Live Scenario.


 

Contact Become member My MFFBAS Meer

Contact

033 303 7322
vragen@mffbas.nl
Van Asch van Wijckstraat 55
3818 LH Amersfoort
KVK: 84811439
BTW: NL863384183B01
Join us My MFFBAS